澳洲幸运5开户www.a55555.net)是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。

Prime Minister Ismail Sabri Yaakob says construction of Phase 2 of the Sarawak-Sabah link road and the Trans-Borneo Highway will start early next year. – The Malaysian Insight file pic, August 7, 2022.

THE federal government has approved the construction of Phase 2 of the Sarawak-Sabah link road (SSLR) and the Trans-Borneo Highway (LTB), which will commence early next year, Prime Minister Ismail Sabri Yaakob said.

He said the technical study of the two projects that connect Miri to Limbang and Lawas, and are expected to take three to five years to complete, is now at the final stage.

He said the projects will not only enable residents in northern Sarawak to go to Sabah via two road network options but also provide benefit to those living around Mulu, Long Seridan, Nanga Medamit, Long Lopeng, Ba’kelalan and Merarap, who still depend on logging roads.

“Those travelling from Miri to Limbang and Lawas via Brunei can use the 96km LTB stretch, which will be ugpraded into a two-lane dual-carriageway.

“For those who choose to avoid going through Brunei to go to (Sabah), they can travel via the SSLR Phase 2, which spans 326km and is a continuation of the SSLR Phase 1 from Simpang Gelugus to Long Lopeng,” he said when opening the Pujut section of the Sarawak portion of the Pan Borneo Highway, in Miri today.

Also present were Sarawak Premier Abang Johari Openg and Senior Works Minister Fadillah Yusof.

,

新加坡博彩公司总行地址www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。新加坡博彩公司总行地址上最新新加坡博彩公司总行地址会员登录线路、新加坡博彩公司总行地址代理网址更新最快。新加坡博彩公司总行地址开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

Ismail said the projects, which cost RM10.62 billion, will also enable communities and residents in Miri, Limbang and Lawas to enjoy a safer and more comfortable road network.

On the opening of the Pujut section of the Pan Borneo Highway, Ismail said it was a continuation of the successful construction of highway projects in the peninsula.

“The implementation of the Pan Borneo Highway project is the federal government’s commitment to develop a planned, systematic and efficient infrastructure network for Keluarga Malaysia in Sarawak,” he said.

“The scope of this Pujut section construction involves upgrading of the federal roads, the construction of two bridges and four bus stops, which started on November 1, 2016 and was fully completed on July 2.” 

Ismail said the project will also expand transport network and connectivity between towns and districts to potential growth centres such as ports, industrial areas and commercial centres along the route.

The 15.9km stretch of the Pujut section of the Pan Borneo Highway, which connects the Miri Airport intersection and the Pujut link road, was built at an estimated cost of RM470 million. – Bernama, August 7, 2022.

乐陵便民网声明:该文看法仅代表作者自己,与乐陵便民网无关。转载请注明:澳洲幸运5开户(www.a55555.net):Work on Phase 2 of Sarawak-Sabah link road, Trans-Borneo Highway to begin next year
发布评论

分享到:

新2网址(www.hg108.vip):Apple warns of flaw that lets hackers into iPhones, Macs
1 条回复
  1. 胜负彩开奖(www.99cx.vip)
    胜负彩开奖(www.99cx.vip)
    (2022-09-04 00:11:45) 1#



    每个人都应该看

发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。